In the ​​Krapina- Zagorje County region there is a gas thermal power plant - Jertovec - 83 MW of power, which according to the Physical Planning Programme of the Republic of Croatia has been classified as one of the priorities for increasing production. The main distribution substation connection points are - 110/35/10 kV in Zabok, Hum na Sutli and Jertovec - which are integral parts of the transmission power system of the Republic of Croatia. Currently the fourth facility is being built, a 110/20 kV substation in Krapina.

Table 18  Electricity prices in the Krapina-Zagorje County, according to tariffs for 2010

 

 

Tariff element

Voltage

Tariff model

Active power

Active power

Reactive power

Fee for measuring services and supply

JT

VT

NT

 

 

 

[kn/kWh]

[kn/kWh]

[kn/kWh]

[kn/kW]

[kn/kvarh]

[kn/month]

High voltage

White

-

0.38

0.36

56.55

0.15

92.00

Medium voltage

White

-

0.49

0.42

69.95

0.15

92.00

Low voltage

Blue

0.79

-

-

-

0.15

70.70

White

-

0.83

0.42

-

0.15

70.70

Red

-

0.56

0.45

82.53

0.15

70.70

Orange

-

-

-

-

0.15

70.70

Yellow(public lighting)

0.74

-

-

-

0.15

47.70

VN-OPS

 

-

0.34

0.34

43.77

-

35.00

Source: HEP, all prices include VAT

Table 19 International electricity prices, 2010

Country

US$

Country

US$

Czech Republic

0.1477

Turkey

0.1376

Hungary

0.159

USA

0.0684

Italy

0.2761

Croatia

0.1076

Slovakia

0.1948

 

 

Source: Key world energy statistics, IEA, 2010, HEP prices